Tools and materials
- Pozi or Phillips screwdriver, or a cordless driver with the correct bits
- Supplied waterproof seam tape, or the manufacturer-approved equivalent
- Supplied or manufacturer-approved automotive sealing compound for specified screw and rail joints
- Supplied waterproof bed rail sealing strip
- Lint free cloth and a suitable panel-safe cleaner for preparing sealing surfaces
- Suitable spanners or sockets for the supplied nuts and mounting fixings
- Three or four capable adults to lift and position the assembled canopy
Before you start
Park on firm, level ground and apply the parking brake. Lay out the panels, brackets and hardware packs on a clean, protected surface. If any part is missing, damaged or does not align, stop and contact Ridgevale before drilling, cutting or modifying the canopy or vehicle.
Tools and materials
- Pozi or Phillips screwdriver, or a cordless driver with the correct bits
- Supplied waterproof seam tape, or the manufacturer-approved equivalent
- Supplied or manufacturer-approved automotive sealing compound for specified screw and rail joints
- Supplied waterproof bed rail sealing strip
- Lint free cloth and a suitable panel-safe cleaner for preparing sealing surfaces
- Suitable spanners or sockets for the supplied nuts and mounting fixings
- Three or four capable adults to lift and position the assembled canopy
Check the supplied components
- Canopy roof or body panel
- Left and right side doors
- Front and rear doors (gas struts and hinges pre-fitted)
- Aluminium mounting rails
- Rubber weatherproofing gaskets
- Screw, nut and washer packs, sorted by size; door hardware differs from rail hardware
- Waterproof adhesive strip
- Vehicle mounting brackets; fitment and drilling requirements vary by vehicle and bracket kit
Part A — Assemble the canopy body
Step 1 — Prepare and waterproof the panel seams
Clean and dry every mating surface before applying tape or sealant. Apply the supplied waterproof seam tape along each specified panel joint, including where a door frame meets the roof panel. Press it down continuously with no gaps, folds or stretched sections.
Step 2 — Seal the specified screws
Apply the supplied or manufacturer-approved sealing product to each screw that passes through the roof or rail. Use only the amount and method specified for the product; do not substitute a general purpose adhesive.
Step 3 — Fit the roof rails
Align the aluminium side rails with the roof panel. Insert the prepared screws from underneath and start each fixing by hand before tightening.
Step 4 — Fit the rail gasket
Fit the washered screws and seat the rubber gasket evenly in the rail channel before final tightening. Make sure the gasket is not twisted, stretched or trapped, and that it will seal evenly against the door frame.
Step 5 — Fit and tighten the nuts
Start every nut by hand, then tighten the fixings gradually in sequence so the rail remains aligned. Tighten evenly and securely without overtightening or distorting the rail. Use the manufacturer's torque value if one is supplied.
Part B — Fit the doors
Step 6 — Identify each door
The front, rear, left and right doors are not interchangeable. Identify and orient each door before fitting it.
Step 7 — Match the hardware
Select the hardware pack for the door being fitted. Door fixings differ from the rail fixings used in Part A, so keep the packs separate and do not force a mismatched fixing.
Step 8 — Fit the front and rear doors first
Fit the front and rear doors before the side doors. Start all fixings loosely, then align each hinge and latch before tightening.
Step 9 — Fit the side doors
Fit the left and right side doors using their matching screws and washers. Start all fixings loosely and confirm the doors are correctly oriented before alignment.
Step 10 — Seat every door gasket inward
On every door, make sure the gasket lip faces inward and is fully seated around the complete opening. An incorrectly oriented, twisted or trapped gasket can allow water to enter.
Step 11 — Align and tighten the doors
When every door is aligned and closes freely, tighten its fixings gradually and evenly without overtightening. Recheck hinge movement, latch engagement and every gasket before moving the canopy.
Part C — Prepare the truck bed
Step 12 — Position the assembled canopy
Place the assembled canopy beside the pickup on a protected, stable surface. Confirm the lift route is clear and all doors are closed and latched.
Step 13 — Clean the bed rail and apply the sealing strip
Clean and dry the top edge of the truck bed rail, removing dirt, wax and oil. Apply the supplied sealing strip continuously around the contact surface, with no gaps or overlaps unless the product instructions require them. Do not lower the canopy until the strip is correctly positioned.
Part D — Mount the canopy on the vehicle
Step 14 — Lift with help
Lift carefully with three or four capable adults. Agree the route and a lifting count before starting, keep fingers clear of the bed rail and lower the canopy slowly and evenly. Do not attempt the lift in strong winds or while the vehicle is on uneven ground.
Step 15 — Centre the canopy and check the fit
Lower the canopy centrally so it sits evenly on the sealing strip and has suitable clearance from the cab, tailgate and bed sides. Check that the supplied brackets align with the intended factory mounting points or clamping locations for this vehicle.
Part D — Secure the canopy
Step 16 — Fit the supplied mounting brackets
Use the brackets supplied for this canopy and vehicle combination. A no-drill installation is possible only where the brackets align with the approved factory mounting points or clamping locations. If they do not align, stop and contact Ridgevale. Do not drill or modify the vehicle or brackets without written fitment guidance.
Step 17 — Secure the mounting brackets
Start every bracket fixing by hand. Working diagonally around the canopy, tighten each bracket in stages so the canopy is pulled down evenly. Tighten securely without crushing the bed rail, distorting the canopy or displacing the sealing strip. Use the manufacturer's torque value if supplied.
Step 18 — Complete the mounting check
When all brackets are fitted, confirm that the canopy is centred, stable and evenly supported. Do not drive the vehicle until every check in Part E has been completed.
Part E — Final checks and aftercare
Complete every check before driving the vehicle.
- All canopy, rail and mounting bracket fixings are present and secure.
- The canopy is centred, stable and clear of the cab, tailgate and bed sides.
- Every door opens, closes and latches correctly; hinges and gas struts move smoothly.
- Every gasket is fully seated, faces the correct direction and has no visible gaps.
- The bed rail sealing strip is evenly compressed with no gaps or displaced sections.
- All packaging, protective film, loose tools and unused hardware have been removed.
Water ingress test
After any sealant has cured for the time stated by its manufacturer, test the canopy with a gentle, low-pressure water flow. Inspect all seams, doors, fixings and the bed rail from inside. Rectify any leak before loading the canopy. Do not use a pressure washer for this test or before the sealing products have cured.
After the first journey
Recheck the canopy position and all mounting brackets after 50 to 100 miles, and again after the first off-road journey. Continue to inspect the brackets, seals, hinges and latches as part of routine vehicle maintenance.
Installation support
If the supplied parts do not match the vehicle, or if any bracket or panel does not align, stop the installation and contact Ridgevale at info@ridgevale.co.uk before making any modification.
